Railway Projects

Project: Brent Cross Thameslink Sidings
Client: Re Barnet London Borough
Contract: Capita/Graham Construction
Construction Value: £ 5M
Status: Completed March 2020
Description: Representing the main contractor as the CRE, (Contractors' Responsible Engineer, MEP) on the project for
the New south sidings, accommodation, compounds and
access associated with works for Brent Cross Thameslink
Station. Brent Cross Thameslink Station is a proposed new
Station on the Midland Mainline between Cricklewood and
Hendon stations to serve the Brent Cross Cricklewood
development. The new station is programmed for delivery
in mid-2022. The scope of the works comprised the MEP
installations for the following locations: 
- New service/access road after main compound access gate. 
- New driver’s walkway to the new station  Fuel Retention
Separator (Pollution control unit), power and containment 
- New GTR compound and associated facilities, carriage
wash plant room, CET plant & waste compactor  GTR
Cricklewood South Distribution cubicle (serviced from
Cricklewood South DNO substation) 
- New EMT fuel tank farm/accommodation (by others)  NR
signalling box car park facility (electric vehicle
charging + lighting)  Refeeding of existing drivers
walkway from Handly Grove  New UTX crossing. 

Project: Crossrail West Enhanced Stations Ealing Broadway Station First Floor TOC accommodation
Client: Network Rail
Contract: Arcadis/Graham Construction
Construction Value: £ 500,000
Status: Completed August 2021
Description: Providing the MEP Design services on the project for the Fit out of the existing first floor area above station concourse to accommodate TOC staff.
The scope of the works comprised the MEP installations for the following locations: 
- Lighting on the new service/access route from station below to the accommodation  Union Room, Locker Room, Mess Room, WCs, Comms Room & Lift Lobby
- The fit out included full Mechanical, Electrical & Public Health Services design for;  Power connection to main switchboard including MCCB & sub-mains cable  General power installation  General & Emergency Lighting Installation  Fire detection & Alarm system  CCTV System  Disconnection and removal of all existing services IT installation including connection to an external network and local infrastructure.  

Project: Crossrail West Enhanced Stations Public Realm Works
Client: Network Rail
Contract: Arcadis/Graham Construction
Construction Value: £ 250,000
Status: Completed August 2021
Description: Providing the MEP Design services on the project for the Provision of Public Realm Lighting and services for new Platform shelters.
The scope of the works comprised the MEP installations for the following locations:
- Public Realm Lighting for Ealing Broadway, Acton Main Line and West Ealing Stations
- Power supplies and Lighting for Platform Shelters at Ealing Broadway, Acton Main Line and West Ealing Stations
-  Role included the interface with Network Rail Engineering team, production of and sign off of all relevant NR documents such as F002 & F003 etc